D.C. Cook 1

PWR Indiana Michigan Power / AEP MI · Donald C. Cook

0.0% OFFLINE · 1,009 MW offline
Indiana Michigan Power / AEP1,009 MW mapped capacityPWR

Right Now

0.0%
1,009
30
64.8%

Next Outage INDIVIDUAL

See when this unit comes off the grid next

Projected start date · duration · probability band · confidence on every date.

Unlock Review plans
Cycle evidenceObserved run length and prior refuel spacingWindowProbability range rather than an operator scheduleSource disciplineCurrent status remains observed NRC data

Operational Excellence INDIVIDUAL

Compare this reactor with its operating peers

Operating record · full-outage exposure · breaker-to-breaker streaks.

Unlock
Operating recordLong-run observed generation performanceFull outagesEpisode counts and duration contextRun lengthBreaker-to-breaker evidence from stored history

Operating Timeline · power %

025507510098% FULL2026-07-22 · 100.0%2026-07-23 · 100.0%2026-07-24 · 100.0%2026-07-25 · 100.0%2026-07-26 · 100.0%2026-07-27 · 100.0%2026-07-28 · 100.0%2026-07-29 · 100.0%2026-07-30 · 100.0%2026-07-31 · 100.0%2026-08-01 · 100.0%2026-08-02 · 100.0%2026-08-03 · 100.0%2026-08-04 · 100.0%2026-08-05 · 100.0%2026-08-06 · 100.0%2026-08-07 · 100.0%2026-08-08 · 100.0%2026-08-09 · 100.0%2026-08-10 · 100.0%2026-08-11 · 100.0%2026-08-12 · 100.0%2026-08-13 · 100.0%2026-08-14 · 100.0%2026-08-15 · 100.0%2026-08-16 · 100.0%2026-08-17 · 100.0%2026-08-18 · 100.0%2026-08-19 · 100.0%2026-08-20 · 100.0%2026-08-21 · 100.0%2026-08-22 · 100.0%2026-08-23 · 100.0%2026-08-24 · 100.0%2026-08-25 · 100.0%2026-08-26 · 100.0%2026-08-27 · 100.0%2026-08-28 · 100.0%2026-08-29 · 100.0%2026-08-30 · 100.0%2026-08-31 · 100.0%2026-09-01 · 100.0%2026-09-02 · 100.0%2026-09-03 · 100.0%2026-09-04 · 100.0%2026-09-05 · 100.0%2026-09-06 · 100.0%2026-09-07 · 100.0%2026-09-08 · 100.0%2026-09-09 · 100.0%2026-09-10 · 100.0%2026-09-11 · 100.0%2026-09-12 · 100.0%2026-09-13 · 100.0%2026-09-14 · 100.0%2026-09-15 · 100.0%2026-09-16 · 100.0%2026-09-17 · 71.0%2026-09-18 · 62.0%2026-09-19 · 0.0%2026-09-20 · 0.0%2026-09-21 · 0.0%2026-09-22 · 0.0%2026-09-23 · 0.0%2026-09-24 · 0.0%2026-09-25 · 0.0%2026-09-26 · 0.0%2026-09-27 · 0.0%2026-09-28 · 0.0%2026-09-29 · 0.0%2026-09-30 · 0.0%2026-10-01 · 0.0%2026-10-02 · 0.0%2026-10-03 · 0.0%2026-10-04 · 0.0%2026-10-05 · 0.0%2026-10-06 · 0.0%2026-10-07 · 0.0%2026-10-08 · 0.0%2026-10-09 · 0.0%2026-10-10 · 0.0%2026-10-11 · 0.0%2026-10-12 · 0.0%2026-10-13 · 0.0%2026-10-14 · 0.0%2026-10-15 · 0.0%2026-10-16 · 0.0%2026-10-17 · 0.0%2026-10-18 · 0.0%2026-10-19 · 0.0%JulAugSepOctOct

Outage Record

TypeStartEndDurationMin powerMax MW offline
OFFLINE2026-09-19Open30 d0%1,009

Episode rows are derived from stored NRC power-state transitions; missing publication days are not interpolated.

If It Trips · derived MW offline PRO

🔒 Pro unlocks the five-year zero-power record, full-outage and scram-labelled trip values.Unlock

Breaker-to-Breaker Streak INDIVIDUAL

🔒 Individual unlocks the breaker-to-breaker run value.Unlock

Full Outages INDIVIDUAL

🔒 Individual unlocks the full-outage and scram-labelled trip counts.Unlock

NRC Events 7 DAYS

No linked NRC Event Notifications in this access window.

Plant Record NRC and mapped fleet reference

1975-08-28
2034-10-25
2005-08-30
WEST 4LP
3304 MWt
05000315
AEP
AEP

Plant-reference fields are shown only when a mapped NRC or fleet record is available; unknown fields display —.

NRC docket and licence fields retain source values.Engineering-party fields are never inferred when absent.

Other units at this site

D.C. Cook 2 · 1,168 MW