REACTORS · SPP

Cooper

BWR Nebraska Public Power District NE · Cooper

0.0% OFFLINE · 769 MW offline
Nebraska Public Power District769 MW mapped capacityBWR

Right Now

0.0%
769
21
69.1%

Next Outage INDIVIDUAL

See when this unit comes off the grid next

Projected start date · duration · probability band · confidence on every date.

Unlock Review plans
Cycle evidenceObserved run length and prior refuel spacingWindowProbability range rather than an operator scheduleSource disciplineCurrent status remains observed NRC data

Operational Excellence INDIVIDUAL

Compare this reactor with its operating peers

Operating record · full-outage exposure · breaker-to-breaker streaks.

Unlock
Operating recordLong-run observed generation performanceFull outagesEpisode counts and duration contextRun lengthBreaker-to-breaker evidence from stored history

Operating Timeline · power %

025507510098% FULL2026-07-22 · 100.0%2026-07-23 · 100.0%2026-07-24 · 100.0%2026-07-25 · 70.0%2026-07-26 · 100.0%2026-07-27 · 100.0%2026-07-28 · 100.0%2026-07-29 · 100.0%2026-07-30 · 100.0%2026-07-31 · 100.0%2026-08-01 · 100.0%2026-08-02 · 100.0%2026-08-03 · 100.0%2026-08-04 · 100.0%2026-08-05 · 100.0%2026-08-06 · 100.0%2026-08-07 · 100.0%2026-08-08 · 99.0%2026-08-09 · 99.0%2026-08-10 · 98.0%2026-08-11 · 98.0%2026-08-12 · 98.0%2026-08-13 · 97.0%2026-08-14 · 97.0%2026-08-15 · 96.0%2026-08-16 · 95.0%2026-08-17 · 95.0%2026-08-18 · 95.0%2026-08-19 · 95.0%2026-08-20 · 95.0%2026-08-21 · 94.0%2026-08-22 · 70.0%2026-08-23 · 94.0%2026-08-24 · 93.0%2026-08-25 · 91.0%2026-08-26 · 91.0%2026-08-27 · 91.0%2026-08-28 · 91.0%2026-08-29 · 91.0%2026-08-30 · 91.0%2026-08-31 · 90.0%2026-09-01 · 90.0%2026-09-02 · 90.0%2026-09-03 · 90.0%2026-09-04 · 89.0%2026-09-05 · 90.0%2026-09-06 · 90.0%2026-09-07 · 89.0%2026-09-08 · 87.0%2026-09-09 · 87.0%2026-09-10 · 87.0%2026-09-11 · 86.0%2026-09-12 · 86.0%2026-09-13 · 84.0%2026-09-14 · 85.0%2026-09-15 · 85.0%2026-09-16 · 84.0%2026-09-17 · 84.0%2026-09-18 · 84.0%2026-09-19 · 84.0%2026-09-20 · 83.0%2026-09-21 · 83.0%2026-09-22 · 83.0%2026-09-23 · 82.0%2026-09-24 · 81.0%2026-09-25 · 81.0%2026-09-26 · 81.0%2026-09-27 · 81.0%2026-09-28 · 0.0%2026-09-29 · 0.0%2026-09-30 · 0.0%2026-10-01 · 0.0%2026-10-02 · 0.0%2026-10-03 · 0.0%2026-10-04 · 0.0%2026-10-05 · 0.0%2026-10-06 · 0.0%2026-10-07 · 0.0%2026-10-08 · 0.0%2026-10-09 · 0.0%2026-10-10 · 0.0%2026-10-11 · 0.0%2026-10-12 · 0.0%2026-10-13 · 0.0%2026-10-14 · 0.0%2026-10-15 · 0.0%2026-10-16 · 0.0%2026-10-17 · 0.0%2026-10-18 · 0.0%2026-10-19 · 0.0%JulAugSepOctOct

Outage Record

TypeStartEndDurationMin powerMax MW offline
OFFLINE2026-09-28Open21 d0%769
DERATE2026-08-132026-09-2846 d70.0%231

Episode rows are derived from stored NRC power-state transitions; missing publication days are not interpolated.

If It Trips · derived MW offline PRO

🔒 Pro unlocks the five-year zero-power record, full-outage and scram-labelled trip values.Unlock

Breaker-to-Breaker Streak INDIVIDUAL

🔒 Individual unlocks the breaker-to-breaker run value.Unlock

Full Outages INDIVIDUAL

🔒 Individual unlocks the full-outage and scram-labelled trip counts.Unlock

NRC Events 7 DAYS

No linked NRC Event Notifications in this access window.

Plant Record NRC and mapped fleet reference

1974-07-01
2034-01-18
2010-11-29
GE 4
2419 MWt
05000298
B&R
B&R

Plant-reference fields are shown only when a mapped NRC or fleet record is available; unknown fields display —.

NRC docket and licence fields retain source values.Engineering-party fields are never inferred when absent.

Other units at this site